Universal 2K

2 - Stage System

  • 1
    Primer
  • 2
    Topcoat

P565-38XX

Universal 2K® Primer

A Universal 2K® Primer based on the latest technical developments in primer technology, to be used where optimisation of the repair and building processes are key requirements.

It can be applied direct to metal , and can also be topcoated up to five days later without the need for primer sanding.

  • 1
    Primer
  • 2
    Topcoat

Topcoat

Please choose a topcoat to complete the system.

P650-1000

TURBO VISION® Premium High Flow Topcoat

Turbo Vision Premium High Flow Topcoat is an easy to spray topcoat providing high opacity, outstanding gloss appearance and long term durability, meeting the highest standards demanded by the fleet market. 

P650-1010

TURBO VISION® Premium High Build Topcoat

TURBO VISION® Premium High Build 2-pack EHS Topcoat is mainly dedicated for builders due to the exceptional coverage over rivets, welds and complex shapes.

Turbo Vision Premium High Build Topcoat is an easy to spray topcoat providing high opacity, gloss and colour reproducibility, along with process efficiency and long term durability which meets the highest standards demanded by the builder and fleet market.

P650-6000

TURBO VISION® Matt Topcoat

TURBO VISION® Premium Matt Binder has been optimised to deliver an even and deep matt finish for Commercial Transportation Vehicles.

Turbo Vision Premium Matt Binder can be used alone or with other Turbo Vision binders to obtain all gloss levels from deep matt to semi-gloss, keeping the ease of spraying and providing high opacity, outstanding general appearance with long term durability, which fully meets the highest standards demanded by fleet market.

P651-9006

TURBO VISION® RAL9006 Aluminium Ready Mix

TURBO VISION® Topcoat line contains a full spectrum of solid colours. With the Ready Mix RAL9006 a range of popular metallics colours can be made.

Turbo Vision RAL9006 Aluminium Topcoat is an easy to spray topcoat providing good opacity, high gloss and general appearance which meets the highest standards demanded by the fleet market. 

P651-9006 requires a two coat application to achieve a high quality finish.

P650-1020

TURBO VISION® Premium High Productivity Topcoat

TURBO VISION® Premium High Productivity 2-pack EHS Topcoat is dedicated for builders using high pressure application methods including air-assisted airless spray. It is also suitable for electrostatic spray application and use through plural-mix equipment.

Turbo Vision Premium High Productivity Topcoat is an easy to spray topcoat providing high opacity, gloss and colour reproducibility, along with process efficiency and long term durability which meets the highest standards demanded by the builder and fleet market. 


System Summary

Substrates:

  • Old / New Paintwork
  • Aluminium
  • Steel
  • Blasted Steel
  • Galvanised Steel
  • Stainless Steel
  • Primed Surface
  • GRP

Objects:

  • Truck/ Trailer Body
  • Tanker / Tipper
  • Bus
  • Van
  • Cab
  • Chassis
  • Rail
  • Parts

Performance:

Speed of Process refers to the process time and the number of stages of the painting process.

Systems rated with fewer arrows deliver a slower process with more stages.

Systems rated with more arrows deliver a faster process with fewer stages.

Speed of Process

Systems rated with fewer arrows may deliver a finish with more orange-peel and/ or lower gloss. 

Systems rated with more arrows will deliver a smoother finish and higher gloss.

Appearance of Finish

Additional Benefits:

High Versatility

Fast Airdry


System Summary

Substrates:

  • Old / New Paintwork
  • Aluminium
  • Steel
  • Blasted Steel
  • Galvanised Steel
  • Stainless Steel
  • Primed Surface
  • GRP

Objects:

  • Truck/ Trailer Body
  • Tanker / Tipper
  • Bus
  • Van
  • Cab
  • Chassis
  • Rail
  • Parts

Performance:

Speed of Process refers to the process time and the number of stages of the painting process.

Systems rated with fewer arrows deliver a slower process with more stages.

Systems rated with more arrows deliver a faster process with fewer stages.

Speed of Process

Systems rated with fewer arrows may deliver a finish with more orange-peel and/ or lower gloss. 

Systems rated with more arrows will deliver a smoother finish and higher gloss.

Appearance of Finish

Additional Benefits:

High Versatility

Fast Airdry


System Summary

Substrates:

  • Old / New Paintwork
  • Aluminium
  • Steel
  • Blasted Steel
  • Galvanised Steel
  • Stainless Steel
  • Primed Surface
  • GRP

Objects:

  • Truck/ Trailer Body
  • Tanker / Tipper
  • Bus
  • Van
  • Cab
  • Chassis
  • Rail
  • Parts

Performance:

Speed of Process refers to the process time and the number of stages of the painting process.

Systems rated with fewer arrows deliver a slower process with more stages.

Systems rated with more arrows deliver a faster process with fewer stages.

Speed of Process

Systems rated with fewer arrows may deliver a finish with more orange-peel and/ or lower gloss. 

Systems rated with more arrows will deliver a smoother finish and higher gloss.

Appearance of Finish

Additional Benefits:

High Versatility

Fast Airdry


System Summary

Substrates:

  • Old / New Paintwork
  • Aluminium
  • Steel
  • Blasted Steel
  • Galvanised Steel
  • Stainless Steel
  • Primed Surface
  • GRP

Objects:

  • Truck/ Trailer Body
  • Tanker / Tipper
  • Bus
  • Van
  • Cab
  • Chassis
  • Rail
  • Parts

Performance:

Speed of Process refers to the process time and the number of stages of the painting process.

Systems rated with fewer arrows deliver a slower process with more stages.

Systems rated with more arrows deliver a faster process with fewer stages.

Speed of Process

Systems rated with fewer arrows may deliver a finish with more orange-peel and/ or lower gloss. 

Systems rated with more arrows will deliver a smoother finish and higher gloss.

Appearance of Finish

Additional Benefits:

High Versatility

Fast Airdry


System Summary

Substrates:

  • Old / New Paintwork
  • Aluminium
  • Steel
  • Blasted Steel
  • Galvanised Steel
  • Stainless Steel
  • Primed Surface
  • GRP

Objects:

  • Truck/ Trailer Body
  • Tanker / Tipper
  • Bus
  • Van
  • Cab
  • Chassis
  • Rail
  • Parts

Performance:

Speed of Process refers to the process time and the number of stages of the painting process.

Systems rated with fewer arrows deliver a slower process with more stages.

Systems rated with more arrows deliver a faster process with fewer stages.

Speed of Process

Systems rated with fewer arrows may deliver a finish with more orange-peel and/ or lower gloss. 

Systems rated with more arrows will deliver a smoother finish and higher gloss.

Appearance of Finish

Additional Benefits:

High Versatility

Fast Airdry

{0} of 3 selected Compare Systems